Neki od najvažnijih radova u Srbiji tokom prethodnih 5 godina su:
- Self supply of HPP Bajina Basta, Bajina Basta, Perućac on river Drina
- TS in diary factory „IMLEK”, Belgrade, Padinska Skela bb (6x1250kVA in 2 transformer substations)
- Office building B37, New Belgrade, Bul. Milutina Milankovića 58 (5.000m2)
- Overhaul of Hotel „IZVOR”, Arandjelovac (8.000m2)
- Overhaul of electrical installation in elementary and secondary schools financed by World Bank energy efficiency programme
- Production hall „REUM” (now occupied by “PANASONIC”), Svilajnac (10.000m2)
- Self supply of HPP Đerdap I, Kladovo on river Danube
- in NIGERIA for ENERGOPROJEKT OPREMA
- Electrical distribution installations in production halls, FAS (FIAT Automobili Srbija), Kragujevac (50.000m2)
- Organic Waste Treatment Plant, Inđija (8.000m2)
- Upgrade of 630kW motor feeding from softstarter to frequency converter with switch over SG „VICTORIA OIL”, Šid
- Installation of TRansformer and MCC in TPP „DRMNO”, Kostolac (2x2500kVA, 4000A)
- Replacement of LV switch gear in „CENTROSPICE” (now NESTLE), Surčin (2x1250kVA)
- TS extension with TR replacement „IMLEK”, Belgrade, Padinska Skela bb (1600kVA)
- LV switgh gear in TS and main feeding busbars in shopping mall „CAPITOL PARK”, Šabac (2x1600kVA)
- Replacement of LV switcgear in transformer substation „NESTLE”, Surčin (1x1000kVA)
- Extension and automatizatin of dialysis solution line„FRESENIUS MEDICAL CARE”, Vršac
- Cabling, Instalation and Connection of LV installations and equipment in new production facilitiy „TIGAR TYRES” (MICHELIN factiry in Serbia), Pirot (23.000m2)
- Distribution boards for „SPIMACO” pharmaceutical company in Buraydah, Kingdom of Saudi Arabia for „DECO”
- Electrical installations Hotel in Belgrade, Francuska 11, for „SRBOTEL” (1.200m2)
- TRansformer, MV switchgear, LV switchgear, busbars and MCC for feeding of new production lines in „BALL Packaging Europe Belgrade (1x2000kVA)
- Busbars and distribution board for feeding of new machines in „PANASONIC”, Svilajnac“ (1600A and 1000A)
- Transformers, main busbars, main and subdistribution boards for Business tower in Malabo, Equatorial Guinea for „DECO” (3x1600kVA)
- Replacement of MV switchgear, Transformer and LV switchgear in Water utility company, Pančevo (1x630kVA)
- Distribution boards for „Beach Bank“ in Malabo, Equatorial Guinea for „DECO”
- Replacement of MV switchgear, Transformer and LV switchgear in „MARBO” (now owned by PEPSICO-Greek branch), Bački Maglić (1x1600kVA)
- Upgrade of flour and sugar pneumatic transport and supervision systems including SCADA control and supervision in „STARK”, Belgrade (now owned by Croatian company Atlantic Group)
- Upgrade including SCADA supervision of parameters in CR-s, for „ZDRAVLJE” pharmaceutical factory (now owned by TEVA), Leskovac
- Transformers, main busbars, main and subdistribution boards for Hotel in Malabo, Equatorial Guinea for „DECO” (3x1600kVA)
- TS extension with TR replacement including additional busbars and consumers feeding in „IMLEK”, Belgrade, Padinska Skela bb (1600kVA)
- Production extension including new complete TS and busbars feeding DB’s from MDB in „BALL PACKAGING”, Belgrade, Zemun (1600kVA)
Neki od najvažnijih radova u Rusiji tokom prethodnih 5 godina su:
- Business centre, Moskva, St.S.Makeeva 13 (36.000m2)
- Pharmaceutical factory R-Farma, Yaroslavl, St.Gromova 15 (10.000m2)
- Central office company RUSGIDRO, Moskva, St.M.Dmitrovka 7 (14.000m2)
- Pharmaceutical factory TAKEDA, Yaroslavl, St. Pozarskova (22.000m2 including 7.000m2 of CR)
- Pharmaceutical factory BERLIN CHEMI, Kaluga, St. Avtomobiljnaja (11.000m2 of CR)
- Pharmaceutical factory ASTRA ZENEKA, Dobrino (13.500m2 including 2.600m2 of CR)
- Pharmaceutical factory TEVA, Yaroslavl (12.500m2 including 3.800m2 of CR)
- Pharmaceutical factory NOVARTIS, St. Petersburg (25.000m2 including 7.000m2 of CR)
- Pharmaceutical factory VALENTA PHARM, Scelkovo (17.500m2 including 4.500m2 of CR)
- Hospital „MOTHER and CHILD”, Samara (LV, BMS including SCADA control and ELV systems)
- Hospital „MOTHER and CHILD”, Tyumen (LV, BMS including SCADA control)